Senior Project Manager

A spec is not a plan, the gap between "here's what we want" and a scoped, sequenced set of tasks a team can actually execute against is where most timelines quietly fall apart. This service takes your specs, however rough, and turns them into realistically estimated tasks with real dependencies and a schedule that accounts for the way your team actually works, not an idealized version of it. It's built for teams that have clear requirements but keep missing dates anyway, because scoping and sequencing never got the attention the requirements did. The result is a delivery plan you can hold people to, because it was built from how the work really breaks down instead of guesswork.

This is a capability we deliver for you as a service, not a role we’re hiring for.

How We’d Approach This

A clear, staged plan, not a black box

These are the service-specific steps inside our six-step process.

  1. 1

    Review the specs and current backlog to find where scope is vague or estimates don't match past velocity.

  2. 2

    Break one workstream into fully scoped, estimated tasks and run it for a sprint to validate the estimates.

  3. 3

    Review actual velocity against the plan and recalibrate estimates and sequencing accordingly.

  4. 4

    Manage the full schedule day to day, tracking progress and flagging slippage before it compounds.

What You Get

Deliverables from this engagement

  • A fully scoped, estimated task breakdown from the source specs
  • A realistic delivery schedule with dependencies mapped
  • A running progress and risk-tracking report
  • A recalibrated estimation baseline for future planning

Six Ways We Could Architect This

Different engagement, different build, pick the shape that fits

There’s more than one way to deliver on this service. Browse a few of the ways we’d structure the work, depending on your speed, budget, and integration needs.

Read all 6 architectures as text

Lean Fast-Start Architecture

Spec Intake

  • Raw Spec Document
  • PM Reads and Clarifies Gaps
  • Open Questions Logged

Manual Scoping

  • Spec Broken Into Tasks
  • Tasks Estimated by Hand
  • Dependencies Noted

Simple Schedule

  • Spreadsheet Gantt Chart
  • Sequenced by Dependency
  • Shared With Team

Daily Tracking

  • Daily Standup Update
  • Slippage Flagged Early
  • Schedule Adjusted

Cloud-Native / Managed Services Architecture

Spec Ingestion

  • Spec Uploaded to Cloud Workspace
  • Historical Velocity Data
  • Team Capacity Calendar

Managed Estimation

  • Task Breakdown in Linear or Jira
  • Story Point Estimation
  • Dependency Mapping Tool

Cloud Schedule Platform

  • Cloud Roadmap View
  • Sprint Planning Board
  • Automated Burndown Chart

Stakeholder Reporting

  • Velocity Dashboard
  • Risk and Slippage Report
  • Recalibrated Baseline

Event-Driven & Automation-First Architecture

Triggers

  • Spec Change Submitted
  • Sprint End Date Reached
  • Task Marked Blocked

Automated Replanning

  • Automation Rule Engine
  • Re-Scoping Workflow Triggered
  • Dependency Graph Recalculated

Automated Alerts

  • Slack Alert on Slip Risk
  • Auto-Created Blocker Ticket
  • Stakeholder Notified of Change

Sprint Rollover

  • Incomplete Tasks Auto-Rolled Over
  • PM Reviews Rollover List
  • Schedule Auto-Updated

Enterprise-Grade & Compliance-Ready Architecture

Change Control

  • Change Request Submitted
  • Change Control Board Review
  • Approved Scope Baseline

Baseline Schedule

  • Locked Schedule Baseline
  • Version-Controlled Schedule Document
  • Audit Trail of Revisions

Risk Register

  • Documented Risk Register
  • Weekly Risk Review
  • Escalation to Sponsor

Continuity

  • Backup PM Assigned
  • Handover Documentation
  • Governance Report to Leadership

AI-Augmented, Human-in-the-Loop Architecture

Spec and History

  • Raw Spec Text
  • Historical Task Durations
  • Team Velocity Data

AI Scoping Engine

  • AI Extracts Candidate Tasks From Spec
  • AI Estimates Effort From Historical Data
  • Draft Schedule With Dependencies

Human Approval Checkpoint

  • PM Reviews Draft Schedule
  • Approve Schedule
  • PM Adjusts Estimates and Sequence

Committed Schedule

  • Schedule Committed to Team
  • Actual Progress Logged
  • Estimation Model Recalibrated

Integration-Heavy / Ecosystem-Connected Architecture

Client Tooling

  • Jira or Linear
  • Time Tracking Tool
  • CI CD Pipeline Status
  • Finance and Budget System

Integration Connectors

  • Task Sync Connector
  • Time Sync Connector
  • Budget Sync Connector

Schedule Control Plane

  • Unified Task and Dependency Model
  • Progress and Burn Tracker
  • Risk and Slippage Detector

Sync Back

  • Updated Schedule Pushed to Jira
  • Burn Report Pushed to Finance
  • Alert Pushed to Slack

More in Project & Program Management

  • Jira Workflow Steward

    Git-linked Jira workflow discipline that keeps branch strategy and delivery fully traceable.

  • Meeting Notes Specialist

    Structured meeting summaries that capture decisions, action items, and open questions.

  • Studio Producer

    High-level multi-project orchestration and portfolio-level resource allocation.

  • Project Shepherd

    End-to-end cross-functional project coordination and stakeholder management.

Ready to get started?

Tell us what you’re trying to get done and we’ll help you find the highest-leverage place to start, scoped small enough to prove itself before you commit to anything bigger.

Talk to us about Senior Project Manager